Year | Project | Scope | Status |
---|---|---|---|
2014~2015 | ST550 Series Accommodation Semi Unit | Concept and Basic design | Completed |
2014~2015 | Semi Submersible Cobra | Basic and Detail design | Completed |
2011~2013 | Jasper Finder Drilling Semisubmersible Conversion To Accommodation Unit | Full Scope of Basic Design of the Semi for all disciplines including the 500 men Accommodation module, Mooring Analysis. | Completed |
2010~2011 | Semi-Submersible Sea Dragon 02 | Accommodation and Helideck structure approval & detail design and 3D modeling, Columns & Pontoons Piping detail design and 3D engineering, Outfitting detail design, etc. | Completed |
2008 | Semi-Submersible Energy Driller | New MRT Installation engineering, Drill floor structure analysis, New control house installation engineering. | Completed |
2010~2011 | Semi-Submersible Sea Dragon 02 | Accommodation and Helideck structure approval & detail design and 3D modeling, Columns & Pontoons Piping detail design and 3D engineering, Outfitting detail design, etc. | Completed |